Working with Allied has been an absolute pleasure. I never had an issue, only solutions. That to me is priceless. It’s a game changer.
Brandan Smith, Owner, Gray Horse Creations, Inc., Manhattan, MT
ALLIED BIM ADVANTAGES
- Reducing the job from 30 days to 11 resulted in a 64% increase in productivity.
- The installer estimated that with improvements gained using Allied on this job, the next one could be reduced by 2 more days, providing a 70% increase in productivity.
- Using Allied allowed a savings of 3,000 linear ft of material from the original material take-off, resulting in $7,500 dollars in material savings.
- Additionally, with $14,000 in labor savings and machinery rental costs and getting other disciplines on site sooner, the installer estimated $40,000 in total savings.
- In addition to a rapid ROI on the Allied BIM investment, they also increased safety on the project, improved material processing times/efficiencies and decreased the overall project timeline